Looking for an engineer
Full industrial plant survey and drawing update
Projektfeladat — helyszín egyeztetés szerint
The current state of a production plant consisting of several halls and technologies needs to be surveyed, then the hall drawings updated to match the real layout.
In the current documentation:
- some equipment and technological elements are missing;
- certain dimensions are incorrect;
- several elements are not located where the drawings show them.
We are looking for an engineer who:
- has at least 2–3 years of experience in an industrial environment;
- has already carried out production hall surveys or prepared hall drawings;
- knows the basic legal and safety requirements for industrial facilities, especially firefighting and escape route considerations;
- works independently, accurately and to deadline.
Expected duration: at least one month, to be completed within two months.