← Back to projects

Looking for an engineer

Energy certification and electrical safety report

Projektfeladat — helyszín egyeztetés szerint

We are looking for an energy certification engineer with the required Hungarian TÉ qualification to prepare the energy documentation of a site, and an electrical engineer to prepare the building's electrical safety report.

Profiles sought:

  • energy certification engineer with TÉ qualification;
  • electrical engineer for the electrical safety report.
Apply by e-mail